Planning guide
What it really costs to equip a 2,000 sq ft studio
How the budget splits across rig, free weights, cardio, flooring and storage — and the costs that never appear on an equipment quote.
A 2,000 square foot room is the most common first facility, and it is the size where budgets go wrong most often — big enough to need real equipment, small enough that every wrong purchase costs you floor space you cannot get back.
Here is how the money actually splits.
Three ways to equip the same room
Pricing is quoted per facility. Send us your room and we will build the numbers against real manufacturer pricing rather than a package tier.
Lean build
Enough to open and train members properly, with obvious gaps you fill from revenue. Racks and free weights carry the room; cardio is minimal; flooring is zoned rather than wall-to-wall.
| Line item | Budget |
|---|---|
| Rig and racks | $____ |
| Free weights and bars | $____ |
| Cardio | $____ |
| Functional and conditioning | $____ |
| Flooring | $____ |
| Storage | $____ |
| Freight and delivery | $____ |
| Total | $____ |
Standard build
What most successful small facilities actually open with. Full flooring, a complete free-weight setup, enough cardio to serve warmups and members who want it.
| Line item | Budget |
|---|---|
| Rig and racks | $____ |
| Free weights and bars | $____ |
| Cardio | $____ |
| Functional and conditioning | $____ |
| Flooring | $____ |
| Storage | $____ |
| Freight and delivery | $____ |
| Total | $____ |
Full build
The room finished on day one, with no phase two.
| Line item | Budget |
|---|---|
| Rig and racks | $____ |
| Free weights and bars | $____ |
| Cardio | $____ |
| Functional and conditioning | $____ |
| Flooring | $____ |
| Storage | $____ |
| Freight and delivery | $____ |
| Total | $____ |
The costs that are not on the equipment quote
This is where first-time owners get hurt, because none of it appears on the number a salesperson gives you.
Freight class and liftgate fees. Commercial equipment ships LTL freight, not parcel. If your building has no loading dock, you need a liftgate — and that is a separate charge per delivery. If the truck cannot reach your door, it is another charge again. Ask what the delivered price is, not the equipment price.
Inside delivery and placement. Freight standard is curbside. Getting a 600-pound rack from the curb to its spot on your floor is either a service you pay for or a Saturday you spend with four friends and a pallet jack.
Assembly and installation. Rigs and selectorized machines arrive knocked down. Rig installation in particular is not a weekend project — bolt patterns, floor anchoring, and squaring all matter, and doing it wrong voids warranties.
Floor preparation. Covered in detail in the flooring guide, but budget for it. A slab that is out of tolerance or holding moisture has to be corrected before rubber goes down.
Phase two, which always arrives. Every facility discovers within ninety days that it needs more storage, more of one thing, and one piece nobody planned for. Hold back part of the budget instead of finding out you spent it.
How to think about the split
Spend on what carries load and gets used every hour — racks, bars, plates, and flooring. Be conservative on machines that serve one movement. In a room this size, versatility beats station count every time, and the thing most people over-buy is cardio.
Want a plan for your room? Send the dimensions and your opening target and we will help you sort the scope before the order gets complicated.